Mitsubishi Electric UK: Melcotel System Case Study

Premier Inn required a more efficient air conditioning system in order to reduce their on-site energy consumption, CO2 emissions and running costs through a new control interface. The air conditioning system was left unchanged and only the controls were modified. Premier Inn agreed to use the Leicester hotel as a test site of the Mitsubishi Electric Melcotel system for a period of 18 months during which it would be monitored and analysed. The overall target set by Whitbread was for a 20% savings in energy for a potential roll-out on new build projects. Without reaching this target, the roll-out would not be considered viable.

Go to resource

Tags:
Mitsubishi, control systems, carbon savings, energy savings, energy efficiency

(0)Report a broken link

Comments

Please Log In or Sign Up to rate this resource or make a comment.

Company

(76) Resources

The UK Green Building Council is campaigning for a sustainable built environment. As a charity and membership organisation, we facilitate dialogue between industry and Government to promote greener approaches in the construction sector. Read more


Added by

Martin Fahey
(2) Resources

View profile


Our Sponsors

Ecobuild   Marks and Spencer Mitsubishi Electrica Wates foundation