Green Infrastructure Case Studies at London 2012 Olympics

Four green infrastructure case studies and two micro reports detailing Natural England’s work with the Olympic Delivery Authority (ODA) and the London Organising Committee of the Olympic Games. These summarise how stakeholders worked together to secure a natural environment legacy.

Go to resource

Tags:
green infrastructure

(0)Report a broken link

Comments

Please Log In or Sign Up to rate this resource or make a comment.

Our Sponsors

Ecobuild   Marks and Spencer Mitsubishi Electrica Wates foundation