Case studies
The five adaptation case studies presented in CIBSE's TM55 were funded as part of a larger programme called ‘Design for Future Climate’ creating adaptation strategies for 50 UK building projects supported by the Technology Strategy Board. Read more…
Case studies
Domestic energy-efficient retrofit projects do not come more ambitious than the Victorian mid terrace house in Lena Gardens. Its refurbishment had to tackle the issue of its heat-pervious solid brick walls and leaky sash windows. Read more…
Case studies
Hackney designers Something & Son have built a health spa using just one chiller and a single immersion heater. The case study looks at the pared-down approach to services at the pop-up Barking Bathhouse in East London. Read more…
Guidance and industry reports
New, updated guidance on Legionella bacteria control for facilities/premises manager, engineer, consultant or other person responsible for designing, installing, operating and maintaining building water systems. Read more…
Case studies
This case study around the extension to the award-winning Royal Welsh College of Music and Drama looks at BIM capabilities and the technology currently available. Read more…
Case studies
Energy reduction was at the heart of the transformation of a drab central London office block into a CIBSE award-winning refurbishment. The building has achieved BREEAM Excellent, giving proof of the effectiveness of the building services solution. Read more…